Sorry about not getting any music uploaded in the past few months.
I was visiting my daughter in another state, closing on a home in a new location in Missouri, moving and have been heavily involved with getting to know new neighbors and friends, unpacking boxes, looking for furniture and rehabbing important aspects of our home.
I have finally set up my keyboard and plugged in the organ that came with the house. It is not a fully functional organ, the pedals unfortunately do not work. 😦 Our branch does not have a pedal organ. 😦 But, there are 12 other church congregations in this little town, maybe one of them will have a full pedal organ.
As for what is distracting me….
I have been prepping the bathroom by knocking out plaster, roughing in electric and installing insulation. My goal is to finish before Friday when the Amish guys come to do their stuff.
Tomorrow the plumber comes to replace all the metal water pipes with pex pipe, replace the cast iron sewer pipe with pvc and install a toilet and sink upstairs. Friday the Amish guys come and completely rehab the bathroom – installing new hardwood floors, the support wall for my awesome shower and attaching the drywall to the ceiling. Maybe I can get them to mud the joints too so I can paint.
Then I need to hurry and get the leaking a basement wall fixed before the rainy season starts. It rained today, not much, but we are still sweeping puddles of water into the basement drain.
After the bathrooms are installed and water issues are done, I hope things will start to ‘calm’ down a bit.
So I apologize for being slow. The music is still in scribble form.
I hope to get it notated a bit at a time.
Elizabeth